Topic: | Re:Re:Re:Re:Acton Main Line Road Bridge 18t MGW not a Police matter | |
Posted by: | Chris Bell | |
Date/Time: | 04/08/13 10:03:00 |
"Is the bridge actually the responsibility of the railway?" I have noticed that the shared Chase Road bridge over the Central Line plus (currently) one main line track was closed while only the Main Line section was strengthened, and the two parts are painted separately. |