Topic: | Re:Re:Re:Re:Front Page Account | |
Posted by: | Thomas Barry | |
Date/Time: | 12/02/10 09:28:00 |
At a guess, we're talking about two different things regarding signalling - first being modifying it for the revised track layout (four tracks, longer platforms etc.) which you pretty much have to do at the same time, the second being a total resignalling under the control of a single centre at Upminster. What appears to have happened is that they've bottled out of doing the total resignalling at the same time as the other closures, and will therefore need to revisit this after the Olympics. |